Care Home Refurbishment update!! Image

Care Home Refurbishment update!!

Posted: January 21, 2019


(new kitchen)

 

Here is the end result to the work which commenced at a care home back in June. After a 12 week project full of sweat and toil (but fortunately no tears) and a great working relationship between Aspect Construction and the Green Lodge care home, we now have a beautiful, new care home which can satisfy its customers!

 

The works included the following:

  • Internal decorations throughout
  • Replacement floor coverings
  • Refurbishment of the kitchen facility
  • Replacement of IPS panelling systems
  • Installation of ventilation to a small number of rooms
  • Improvement works to the sanitary facilities

(new bedroom)

Credit to the Aspect team for all their hard work under the management of Aspect Construction Project Manager Rob Adams. I would also like to give credit to the team at the Green Lodge care home who supported the customers inĀ  relocating their belongings and moving rooms as the work was progressing. We pride ourselves on our team of expert builders who always adhere to health and safety. However, this project would not have been possible without the cooperation and patience of the Green Lodge administrators during all the hammering, drilling, painting and frequent relocations over these months. Thank you to MDB Associates for facilitating this process and ensuring that everything ran smoothly.

 

(new living room)

As the refurbishment was coming to an end, a lunch was held for the Aspect team, members of staff at the care home and customers. You can see this in the main picture. This was a really kind gesture and is what makes our construction work meaningful. Its these little things which people are not obligated to do which makes our work and beliefs as an organisation feel valued.

 

The project manager of the Green Lodge Fawzia commented:
“With the dedication and commitment from the team at Green Lodge and the understanding of the nature of the service from Aspect Construction, the refurbishment process was excellent.
Plans needed to be changed and re-accommodated on an almost daily basis but Aspect Construction were a delight to work with, pleasant and understanding and happy to change things at the last minute.”